
蜘蛛直播网 11月19日讯 奥萨苏纳与马拉加的精彩对决,在24直播网为您实时呈现。『财神阿天』专业解说,赛事全程回放,比分实时更新,流畅无卡,回放功能卓越。
财神阿天在24直播网为您提供奥萨苏纳与马拉加比赛的实时在线观看体验,让您不错过任何精彩瞬间。赛事回放和比分更新服务同步呈现,流畅无延迟,强大的回放功能让您尽享赛事精彩。
《每日体育报》报道,随着本赛季的落幕,诺坎普球场将迎来顶棚的安装工程,届时巴塞罗那俱乐部将不得不暂时将主场迁回蒙锥克球场。
19日体育新闻快讯,来自西班牙《体育日报》的消息透露,诺坎普体育场的建设工程正在稳步进行,目前已有约3000名利马克公司的工作人员在场地及其周边区域忙碌施工,新的施工进度计划已经明确。
随着11月22日下周日的临近,标志着巴塞罗那俱乐部重返诺坎普球场整整一年,但工程建设的步伐并未减缓。面对投资方和经济部门的持续压力,场内外的施工工作仍在加速进行,这一切都由巴萨运营总监森特列斯全面协调。
The inaugural building to be unveiled is the new museum, set to open in December, situated on the second level of the主席台侧的 grandstand, spanning an impressive 2500 square meters. The new official store and Barça Café are scheduled to open in the first quarter of 2027. In mid-March, the circular VIP lounge area on the side grandstand will be introduced for the first time, marking an agreement with Goldman Sachs and Limac, with the priority of generating revenue from this area before the end of the season. Following the conclusion of the current season, Flick's squad will play several matches at the Montjuïc Olympic Stadium before the roof installation commences at the Nou Camp. Post the opening of the side grandstand VIP lounges, the stadium's capacity will expand to approximately 66,000 spectators.
在诺坎普,吊装和展开屋顶的工作预计将持续15到20个日历日,然而,球队重返赛场的时间表则更为漫长。一系列的工程任务尚待完成,包括更换球场草皮,以及移除大约18000个座位以利施工进行,此外,屋顶的电缆也需要穿越这一施工区域。
预计至2027年11月,这些项目将告一段落,然而,许可证的获取情况将另当别论。巴塞罗那足球俱乐部已与当地政府达成一致,确保新季能够无障碍地使用蒙锥克球场。俱乐部渴望提前重返诺坎普,预计容纳约7万名观众,这要求获得占用二层看台末段的使用许可,以及启用三层看台的新闻区和UCO区域。在完成顶棚的吊装后,将进行膜材的铺设,这一过程预计耗时6个月。即便足球赛季回归时,顶棚仍将未完全封闭,最终完工后的顶棚重量将达到约6200吨,并在球门区域延伸至禁区内,以确保雨天门将免受雨水侵袭。
尽管目前三层看台尚无法启用,然而座椅安装工程已启动,旨在下一赛季投入使用,届时容纳能力将突破10.4万。为了从7万座增加至这个数字,三层看台以及主席台旁及两球门后的VIP室将需开放,相关区域的许可证已开始发放。从已安装的座椅中可预览,侧面看台将映衬出巴塞罗那队的标志,而主席台一侧则将展示“不仅仅是一家俱乐部”的口号。
In the 2027-2028 season, as the team returns to the iconic Nou Camp, an extensive network of ten vertical transit hubs will be fully operational. Each hub will house six elevators, resulting in a total of over ninety units across the entire stadium. This is a stark contrast to the old stadium, which was equipped with just four elevators. Additionally, the Nou Camp will be fitted with numerous escalators.
In the 2028-2029 season, marked by the UEFA Champions League final being held at the Nou Camp, preparations for peripheral and internal renovations are ongoing. This includes the establishment of a press center capable of seating up to 200 individuals, along with translation and technical staff compartments. The perimeter of the stadium is being fitted with ceramic panels that will illuminate in the future, featuring blue and red on the facade and a grey-brown hue that blends with the urban landscape; however, as per regulations, they are not to be illuminated on a daily basis. The three-tiered grandstand structure is also being equipped with shock-absorbing devices to enhance seismic safety.
HOT NEWS
HOT VIDEO
11月09日西甲第12轮马德里竞技vs巴塞罗那全场录像
11月09日西甲第12轮马德里竞技vs巴塞罗那全场录像
11月09日西甲第12轮马德里竞技vs巴塞罗那全场录像
11月09日西甲第12轮马德里竞技vs巴塞罗那全场录像
11月09日西甲第12轮马德里竞技vs巴塞罗那全场录像
11月09日西甲第12轮比利亚雷亚尔vs赫塔费全场录像
11月09日西甲第12轮马德里竞技vs巴塞罗那全场录像
11月09日西甲第12轮马德里竞技vs巴塞罗那全场录像
11月09日西甲第12轮马德里竞技vs巴塞罗那全场录像
11月09日西甲第12轮马德里竞技vs巴塞罗那全场录像